 12

There are 96 water pipes in the furnace of 1000 kg biomass particles steam generator. The combustion materials enter the yard, enter the combustion chamber through the cutter feeding, and the heat generated after the combustion of the materials through the diesel ignition (instant ignition) enters the furnace bladder. The heat of the three layers is heated by the 96 water pipes, and the heat enters the energy saving machine water tank through the flue. The water in the tank absorbs the heat of the chimney to reach 60~70, and enters the furnace through the pump. Because the water pipe is small, the thermal conductivity is strong, the heating area of a water is large so the temperature rises fast. Generally speaking, 1000kg biomass particle steam generator produces saturated steam in 3 minutes and reaches 8kg in 4 minutes.

 

When we use 1000kg biomass particle steam generator, we also need to make some preparations:

 

1, biomass particle steam generator should be installed in the ventilation conforms to the fire standards, the ground is flat and there is no flammable goods around the site.

 12

2. According to the evaporator distribution requirements introduce single-phase power supply, install leakage protection switch, and connect the water inlet pipe, sewage pipe, steam pipe and instrument valve according to the evaporator factory mark to check whether the pipeline device is correct, and ensure that the valve and switch are in normal condition without any abnormal.

 

3, the factory configuration of control components pressure gauge pressure switch and valve protection chain device to prevent unauthorized change of Settings, because the steam generator whether from the design drawings to materials are required to pass the national inspection, if unauthorized change, will cause some unnecessary trouble to the manufacturer.

 

4. Regular maintenance should be carried out on the evaporator after normal use. Before starting the evaporator every day, the upper and lower ash cleaning doors and furnace should be arranged to check whether there is fuel coking block blocking the furnace in the furnace. In the process of using the steam generator, the water in the furnace should be discharged before shutdown every day. If it is not emptied, the water in the inner tank will cool down and decompress with time, so that the inner tank will appear negative pressure, and the phenomenon of backpouring will reduce the service life of the inner tank.

 12

5. As far as possible, the sewage pipe is connected to the sewer port to prevent the water flowing out of the furnace liner from causing scalding injuries to the workers. If the sewer port is far away, the water pipe can be used to let the water flow to the far area from the workers.

 

6, biomass particle steam generator in the process of use, if there is a power failure phenomenon, to clean the combustion in the furnace in time, to prevent automatic ignition of the phenomenon of reignition.

 

7, every day before the biomass particle steam generator is shut down, it is necessary to check the pressure of the equipment, whether there is an open fire in the furnace, and whether the water in the furnace liner is empty.

 

8, in the use of 1000 kg biomass particles steam generator, water quality to use pure water, because 1000 kg biomass particles steam generator furnace liner (liner) is 96 water pipes, relatively fine, do not use pure water once formed scale, will be corrosive to water pipes, resulting in less and thinner water pipes, affecting the service life.